The data point list includes all control variables, measured variables and feedback signals to be transmitted via telecontrol technology as well as other commands. These include, for example, P, Q, cos(phi) and irradiation. The unit and scaling must be known for each data point, e.g. whether the active power P is to be transmitted in W or kW. In addition, all technical details for functioning communication must be available for the respective type of connection (Modbus/IEC/terminal strip), see section Types of FWT implementation.
The customer or grid operator must provide Amperecloud with a project-specific data point list for each system. This can be waived if it is confirmed in writing that a general data point list provided by the grid operator already contains all the necessary information.
All other information required for communication, such as IP addresses incl. subnet, are preferably transmitted together with the data point list.
Example of (general) data point list. Source [accessed April 12 2024]: https://www.regionetz.de/fileadmin/regionetz/content/Dokumente/TAB/Spezifikation_FWT_Anlage_TAB_Strom_2023_Regionetz.pdf
Need More Help?
If you encountered any difficulties or need further assistance, here are some steps you can take:
Contact Support:
- Email: Reach out to our support team by emailing us at support@amperecloud.com. Provide as much detail as possible about the issue you're facing.
Phone Support:
-
Call our customer service at
+49 30 6293 77201. Our support hours are Monday to Friday, 9 AM to 5 PM (local time).
Share Your Feedback
If this article didn’t meet your needs or if you have suggestions on how we can improve, please let us know by submitting feedback. Your input helps us enhance our resources and support.